Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: a comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(02), 159–73.

  • Type: Journal Article
  • Keywords: concreting; MicroCYCLONE; productivity; simulation
  • ISBN/ISSN: 0969-9988
  • URL: http://www.blackwell-synergy.com/links/doi/10.1046/j.1365-232X.1998.00037.x/abs
  • Abstract:
    Computer simulation in construction planning has been the subject of research for the last few decades. The present paper describes simulation models geared toward improving the productivity of concreting operations. It is primarily concerned with a study of the sensitivity of concreting operations to a set of possible resource combinations. Thirteen models are examined by the two well-known methods of concreting, (1) crane and bucket; and (2) the pump. Concreting into slabs, beams and columns are considered. The simulation software MicroCYCLONE is used for the actual generation of models. Sensitivity parameters considered in resource combinations include the number of truck-mixers, buckets and labourers in concrete placing crews. The simulation models developed are compared and the results are discussed. The results enable planners to realize how the resource quantities and capacities in one cycle affect the ones in another period for cyclic operations like concreting. It can be concluded that the maximum number of resources, the interaction of work crews caused by workspace limitations and the interaction of equipment because of sharing with other activities of the project may bring limitations.

Back, W E and Sanders, S R (1998) Industry expectations for engineering graduates. Engineering, Construction and Architectural Management, 5(02), 137–43.

Ezulike, E L and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(02), 144–9.

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(02), 182–8.

Hansen, K L, MGann, D and Groák, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(02), 115–26.

Hindle, R D and Rwelamila, P D (1998) Resistance to change: architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(02), 150–8.

Junnonen, J M (1998) Strategy formation in construction firms. Engineering, Construction and Architectural Management, 5(02), 107–14.

Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(02), 189–98.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(02), 127–36.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(02), 174–81.